What is the difference between a standard project and a WBS project in SAP PS?

1 Answers
Answered by suresh

Difference between a Standard Project and a WBS Project in SAP PS

Difference between a Standard Project and a WBS Project in SAP PS

Standard projects and Work Breakdown Structure (WBS) projects are two types of projects that can be created in SAP Project Systems (PS) module. Understanding the differences between them is crucial for effective project management in SAP PS.

Standard Project:

  • Standard projects are typically used for simpler project structures with a linear and straightforward hierarchy.
  • They do not require the detailed level of planning and structure that WBS projects do.
  • Activities are organized in a sequential manner without detailed breakdowns.
  • Costs are typically managed at the activity level in standard projects.

WBS Project:

  • WBS projects utilize a hierarchical structure known as the Work Breakdown Structure (WBS) to organize and plan project activities.
  • They allow for a detailed breakdown of project tasks, with multiple levels of sub-activities and work packages.
  • Costs can be assigned at each level of the WBS, providing a more detailed cost control mechanism.
  • WBS projects are well-suited for complex projects that require a high level of planning and control.

Overall, the key difference between a standard project and a WBS project in SAP PS lies in the level of detail and complexity in planning and organizing project activities. Choosing the appropriate project type depends on the specific requirements and scope of the project.

Answer for Question: What is the difference between a standard project and a WBS project in SAP PS?