Understanding the Difference Between Production Planning in SAP ECC and SAP S/4HANA
Production planning plays a crucial role in both SAP ECC and SAP S/4HANA, but there are significant differences between the two systems.
Focus Keyword: Production Planning in SAP ECC vs SAP S/4HANA
Differences in Production Planning in SAP ECC:
In SAP ECC, production planning involves the MRP (Material Requirements Planning) process, which helps in determining the material requirements based on production orders and other factors. The planning is more segmented and requires manual input for various stages of production.
- MRP runs in batch processing.
- Production orders need to be manually converted from planned orders.
- Limited real-time data visibility for decision making.
Differences in Production Planning in SAP S/4HANA:
On the other hand, SAP S/4HANA simplifies production planning by leveraging advanced technologies like in-memory computing and real-time analytics. The system provides a more integrated and automated approach to production planning, offering enhanced visibility and decision-making capabilities.
- MRP runs in real-time.
- Production orders are seamlessly integrated with other processes.
- Enhanced real-time data analytics and reporting for better insights.
Overall, the shift from SAP ECC to SAP S/4HANA brings about a transformation in production planning, moving from manual and segmented processes to automated, integrated, and data-driven operations.
Please login or Register to submit your answer